New Build Yacht Guide

The practical guide to commissioning a new yacht, from the owner's brief to delivery.

Lund Group Yacht DeskCharter & Brokerage Desk6 min readReviewed 6 October 2026

Commissioning a new yacht is a multi-year project with many advisers and significant payment exposure before delivery. This guide explains each stage from the owner's side, and when building makes more sense than buying.

The short answer

Building new gives the owner control over design and specification, but the owner carries time, change and construction risk until delivery. Buying an existing yacht offers certainty and speed. The right choice depends on how much the owner values control, timing and certainty.

The new-build lifecycle

  1. 1 Owner's brief
  2. 2 Designer & naval architect
  3. 3 Yard shortlist / tender
  4. 4 Specification & GA
  5. 5 Contract
  6. 6 Stage payments
  7. 7 Construction & supervision
  8. 8 Sea trials
  9. 9 Delivery
  10. 10 Warranty

Routes to a new yacht

RouteOwner controlTimelineMain risks
Full customHighestLongestDesign, engineering and change risk
Semi-customModerateShorterPlatform limits; interior and option changes
Series / productionLowerShortestLimited personalisation
Build slot / delivery positionDepends on stageCan be shorterContract assignment and what is already fixed
Part-built yachtLimited to remaining workVariesExisting work quality, records and contract history

Relative comparisons only. Actual timelines depend on size, yard capacity and specification.

Build new or buy existing

New buildExisting
Control over designHighLimited to modifications
Time to useYearsOften immediate
Certainty of outcomeLower until deliveryCan be surveyed and trialled
Payment exposureStage payments before deliveryUsually at closing
WarrantyBuilder warranty after deliveryLimited or none

Who does what

OwnerBrief, budget, decisions and approvals
Owner's representativeSpecification, cost, quality and change control for the owner
DesignerExterior and/or interior design
Naval architectHull, stability, structure and performance
ShipyardBuilds to the contract and specification
Class societyPlan approval and construction surveys
Flag administrationRegistration and statutory requirements
Shipbuilding lawyerContract, guarantees and disputes
LenderConstruction or delivery financing, if used
Lund GroupActs for the owner; coordinates and introduces professionals

Independence

Lund Group acts for the owner or buyer. It is not a shipyard, shipyard agent, dealer, designer, naval architect, class society, flag administration, lawyer, surveyor, construction supervisor, lender or insurer. Lund holds no dealership, agency or exclusive appointment with shipyards because they appear on this website. Where a yard or adviser is introduced and a material commercial relationship exists, it is disclosed.

Build new or buy existing?

A new build gives control over design, layout and specification and a builder's warranty. In exchange, the owner waits years, makes stage payments before delivery and carries change and construction risk.

An existing yacht can be surveyed, trialled and used straight away. The trade-off is accepting someone else's design and the yacht's history.

Go deeperHow to buy a yacht·Yachts for sale

Full-custom yachts

A full-custom yacht is designed from a clean sheet around the owner's brief. It offers the most control and the most decisions, engineering and risk.

Semi-custom yachts

A semi-custom yacht starts from an existing hull and engineering platform, with customisation of layout, interior and options within the platform's limits.

Series and production superyachts

Series yachts are built to a defined model with a set option list. Personalisation is limited, but the design is proven and timelines tend to be shorter.

Build slots and delivery positions

A build slot is a reserved construction window at a yard. A delivery position is a contract for a yacht already in the build programme, sometimes assigned from another buyer. Check exactly what is fixed, what can still change and how the contract is assigned.

Part-built yachts

A part-built yacht is a project already under construction, sometimes stalled. Review the quality of existing work, class records, the contract history and the yard's position before committing.

The owner's brief

The brief sets out intended use, guest and crew numbers, cruising areas, style, priorities and budget. A clear brief keeps designers, naval architects and yards aligned.

When to appoint a designer

For full custom, the designer is usually appointed early to develop the concept before yard selection. For semi-custom, design input often focuses on interior and exterior styling.

When to appoint a naval architect

The naval architect is responsible for hull form, stability, structure and performance. They are typically engaged early on custom projects so the concept is technically feasible.

Shortlisting shipyards

Shortlist yards on relevant experience, capacity in the required window, financial standing, quality systems, references and approach to change — not on rankings or marketing claims.

Go deeperBuilder directory

One yard or a tender?

Approaching one yard can be faster and suit an owner set on a particular builder. A tender on a common specification allows like-for-like comparison of price, schedule and terms.

The technical specification

The specification describes systems, materials, equipment and standards. Together with the general arrangement, it defines what the yard is contractually obliged to build.

The general arrangement

The general arrangement (GA) shows the layout of decks, spaces and main equipment. Changes after signing usually become change orders.

The shipbuilding contract

The contract covers price basis, payment schedule, specification, delivery date, delay provisions, change orders, acceptance, warranty, title, guarantees and dispute resolution. It should be negotiated with a specialist shipbuilding lawyer.

Stage payments

Payments are typically made at milestones during construction rather than on delivery. The schedule and the milestones that trigger payment are commercial points to negotiate.

Refund guarantees

A refund guarantee, usually from a bank, can return stage payments if the yard fails to deliver. They are not always available, and their terms and issuer matter.

Escrow, title and liens

Escrow arrangements, title to the hull and materials, and protection against yard creditors are further tools to protect stage payments. Their availability depends on the yard and jurisdiction.

Change orders

Change orders adjust specification, price or time after signing. Agree a written procedure and pricing basis, and expect late changes to cost more.

Delays and price adjustments

Contracts often provide for permissible delays, liquidated damages and price adjustment for changes or specific cost movements. Understand which risks sit with whom.

Class and flag

Class approves plans and surveys construction; flag sets statutory requirements. Decide early whether the yacht will be private or commercial, as it affects design.

Go deeperYacht registration guide

Construction supervision

An owner's supervision team inspects work, tracks progress and protects the owner's interests throughout the build. Agree inspection points with the yard.

Insurance during the build

Builder's risk insurance is usually arranged by the yard; the owner should confirm cover, insured value and their interest in it.

Go deeperYacht insurance guide

Sea trials and acceptance

Sea trials prove performance and systems against the contract. Acceptance follows agreed tests and a punch list of remaining items.

Go deeperYacht sea trial guide

Delivery

At delivery, title passes, final payment is made and documentation is handed over. Registration and insurance must be ready in time.

The warranty period

The builder's warranty covers defects for a defined period after delivery. Plan how warranty claims are recorded and handled with the crew.

VAT and registration

VAT and registration should be planned before delivery with advisers, as they affect where and how the yacht is delivered.

Go deeperYacht VAT guide

Financing a new build

Some owners finance construction or delivery. Lenders will have requirements on the contract, guarantees and insurance.

Go deeperYacht financing guide

Resale and exit

Highly personal custom yachts can be harder to resell. Considering broad appeal in key decisions can protect value.

After delivery

Running costs, crew and management begin at delivery. Plan them in parallel with the build.

Go deeperSuperyacht operating costs·Yacht management costs

Red flags

No written brief; signing before the specification is detailed; no payment protection; no owner's representative; vague change-order terms; unclear yard financial position.

— Preparation tool

Prepare your new-build conversation

Builds a list of topics for your owner's representative, designer, lawyer and yards.

  1. Route?
  2. Owner's brief written?
  3. Owner's representative?
  4. Yard approach?
  5. Specification stage?
  6. Payment protection?
  7. Financing?
  8. Supervision?
  9. Intended use?
  10. Delivery deadline?

Topics to discuss

Answer a few questions to build your list.

No cost, yard recommendation or verdict. Not legal, engineering, tax or financial advice.

— Yacht Desk

Discuss a new build with the Yacht Desk

We act for the owner, help frame the project and introduce owner's representatives, designers, naval architects, lawyers and yards. Any material commercial relationship is disclosed.

Listings, asking terms and availability remain subject to verification. Lund Group does not provide legal or tax advice.

How this guide is maintained: written and reviewed by the Lund Group Yacht Desk. No prices, payment percentages, build times or yard rankings are published. General information only — not legal, engineering, tax or financial advice.

Questions

Should I build a new yacht or buy an existing one?
Build for control and personalisation; buy for certainty and speed.
What is a full-custom yacht?
A yacht designed from a clean sheet around the owner's brief.
What is a semi-custom yacht?
A yacht on an existing platform, customised within its limits.
What is a series or production superyacht?
A defined model with a set option list.
What is a build slot?
A reserved construction window at a shipyard.
What is a delivery position?
A contract for a yacht already in a yard's build programme.
What is a part-built yacht?
A project already under construction, sometimes stalled.
How do I create the owner's brief?
Set out use, guests, crew, cruising areas, style, priorities and budget.
When should I appoint a designer?
Early on custom projects, before yard selection.
When should I appoint a naval architect?
Early, so the concept is technically feasible.
How should shipyards be shortlisted?
On experience, capacity, financial standing, quality and references.
Should I approach one yard or tender?
A tender allows comparison; one yard can be faster.
What is the technical specification?
The document defining systems, materials, equipment and standards.
What is the general arrangement?
The layout drawing of decks, spaces and main equipment.
What is the shipbuilding contract?
The agreement setting price, payments, specification, delivery, warranty and protections.
What are stage payments?
Payments made at construction milestones.
What is a refund guarantee?
Usually a bank guarantee to return stage payments if the yard fails to deliver.
Are refund guarantees always available?
No. Availability and terms depend on the yard and its bank.
What are change orders?
Agreed changes to specification, price or time after signing.
Who supervises construction?
An owner's supervision team or representative.
Is the yacht insured during the build?
Usually under the yard's builder's risk policy; check cover and your interest.
What happens at sea trials?
Performance and systems are proven against the contract.
What happens at delivery?
Title passes, final payment is made and documents are handed over.
What is the warranty period?
A defined period after delivery during which the builder covers defects.
How long does a new build take?
It varies with size, type and yard capacity; ask yards for their schedule.
How much does a new build cost?
It depends on size, specification and yard; Lund does not publish prices.
Can I finance a new build?
Sometimes, subject to lender requirements.
Is Lund a shipyard agent?
No. Lund acts for the owner and holds no dealership or agency with shipyards.
Will Lund disclose commercial relationships?
Yes, any material commercial relationship with an introduced party is disclosed.
Is this guide legal advice?
No. It is general information only.

This guide is general information about how the yacht market conventionally works. It is not legal, technical or financial advice, and it does not describe the terms, pricing or availability of any specific yard, slot or project. Every position is confirmed in writing before anything is committed.

— Receive the Lund Letter

Quiet dispatches on new destinations, charters and members-only experiences.